Warehousing

Ambitech

Ambitech

This project required the consolidation of 5 departments from many parts of the city into one cohesive industrial TI design. With over 1250 pieces of equipment we provided a smooth efficiency the company was hoping for. Each department shinned.

 

Mateo St.

Mateo St.

Working with Los Angeles General Service and Cushman & Wakefield our job was to remodel for their use an industrial property for office and Police car storage. This includes a large metal canopy for services on the rear of the building. This project is tied to the 6th Street bridge area replacement.

First American

First American

This 14,000 s.f. TI was a total redesign for a home insurance company. Each department all the way to each trash can was noted. In the end they said everything worked out as designed with no changes. Even the moving plan was tied down to speed up the move in. The site was where Peter Ueberroth ran the 1984 Los Angeles Olympics from. We also had a tennis court which we converted to a new warehouse sitting on top of the existing court.

Secura Key

We converted existing attic space into storage area as well as made a new opening in exterior tiltup walls for windows 6'-6" wide x 9'-0" high.

Legacy-Mitchell

We have worked with Legacy Construction & Development, Inc. on many projects. They brought us into their design team as the Executive architects. They needed us to take care of onsite issues, such as: design development, construction documents, and assist in the bidding and construction process throughout the entire length of the project. We worked very closely with each sub-consultant to achieve the owners’ dreams of the re-purposing of an existing building in Van Nuys California. This building is a two story with a roof top penthouse. Parking is all on the concrete roof. The existing two-story space was re-designed into a two-story show room experience. The building is totally changed into a high-end corporate jewel. All aspects from structure, energy and water consumption, to accessibility and a new elevator have been integrated into the facility. This is now has a modern dynamic aesthetic for the entire building, including the exterior and interior. Each aspect is custom designed for the new owner’s preferences. Re-purposing an existing building is one of the environmental types of projects one can do. It is great for the owner, and the community.

Legal

The content of this website is provided for information purposes only. While every effort is made to ensure that the information contained within the website is accurate and up to date, JHAI makes no warranty, representation or undertaking whether expressed or implied, nor does it assume any legal liability, whether direct or indirect, or responsibility for the accuracy, completeness, or usefulness of any information.

All materials, unless otherwise stated, are copyright and remain the property of JHAI.